Construction of roundabout Palm Beach

ad-papillon-banner
ad-banner-plbr-playa-linda
ad-banner-setar-tourist-sim-watersport2024
ad-aqua-grill-banner
ad-aruba-living-banner
265805 Pinchos- PGB promo Banner (25 x 5 cm)-5 copy
ad-banner-costalinda-2024
ad-banner-casadelmar-2024

Upcoming Monday, July 4, 2022, will commence the second phase of the construction of the roundabout Palm Beach at the intersection of Palm Beach.

One lane on the western side of the roundabout Palm Beach will be open for traffic in the direction of Oranjestad (South). The eastern side of the roundabout Palm Beach will be closed for construction for approximately eight weeks if no inconvenience arises. Sign and barricades will aid in indicating the detours illustrated below. On the 30th and 31st of August, 2022, the entire roundabout of Palm Beach will be closed to pave the top layer. On September 1, 2022, it will be open for traffic.

The Department of Public Works (DOW) and the Police Force (KPA) urge the general public of Aruba and all motorists and inhabitants to be aware of the upcoming redirection.